CNA Main tunnel works connecting future Changi Airport T5 to existing T2 completed

Main tunnel works connecting future Changi Airport T5 to existing T2 completed

Main tunnel works connecting the future Terminal 5 to the existing Terminal 2 are completed, as the Changi East development gathers pace. Remaining works will connect this main tunnel to the various respective terminals. Once completed in the mid-2030s, the underground links will allow Changi Airport to operate as one integrated airport when the latest mega terminal opens. Charlotte Lim reports.

Watch the full video on YouTube

コメントを送信